MAINTENANCE

Components of Utility department of PDL
>>
Gas Generator (Wakesha Brand from USA, 04 in Number – Total capacity 3.6 MW)
>>
Substation (220-440 volt)


Water, Gas


Boiler (Mechmar brand from Malaysia, 02 in number—Capacity 10.8 ton/hr)


Air compressor (Kaesar brand from Germany , 09 in number, capacity 20.5 m3/minute)


Dryer (capacity 52.5 m3/minute)


Chiller


Effluent Treatment Plant (ETP)


Water Treatment Plant (WTP)
Total water consumption: 700m 3/day. Two boilers is used for supplying steam in Sizing, Finishing, Dyeing unit, washing unit, Chiller with a capacity of 10.8 ton/hour.

Effluent Treatment Plant
Partex Denim Ltd has successfully discharged the e effluent according to environmental law with a capacity of 30 m3/hour.

Process flow chart: (From ascending order)
>>
Effluent
>>
House
>>
Chemical (Poly Aluminum Chloride, Discoloring agent)
>>
House (light water color)
>>
Add chemical (poly electrolyte)
>>
Separation of effluent
>>
Bacteria
>>
pH maintain
>>
Discharges into pond/land
WTP has three chambers:
  1. Multistage (Stone)
  2. Oxidation
  3. Softening by resin