Components
of Utility department of PDL
>>
|
Gas Generator (Wakesha Brand from USA, 04 in Number – Total capacity 3.6 MW) |
>>
|
Substation (220-440 volt) |
Water, Gas | |
Boiler (Mechmar brand from Malaysia, 02 in number—Capacity 10.8 ton/hr) | |
Air compressor (Kaesar brand from Germany , 09 in number, capacity 20.5 m3/minute) | |
Dryer (capacity 52.5 m3/minute) | |
Chiller | |
Effluent Treatment Plant (ETP) | |
Water Treatment Plant (WTP) |
Total
water consumption: 700m 3/day. Two boilers is used for supplying
steam in Sizing, Finishing, Dyeing unit, washing unit, Chiller with a
capacity of 10.8 ton/hour.
Effluent
Treatment Plant
Partex
Denim Ltd has successfully discharged the e effluent according to
environmental law with a capacity of 30 m3/hour.
Process
flow chart: (From ascending order)
>>
|
Effluent |
>>
|
House |
>>
|
Chemical (Poly Aluminum Chloride, Discoloring agent) |
>>
|
House (light water color) |
>>
|
Add chemical (poly electrolyte) |
>>
|
Separation of effluent |
>>
|
Bacteria |
>>
|
pH maintain |
>>
|
Discharges into pond/land |
WTP
has three chambers:
- Multistage (Stone)
- Oxidation
- Softening by resin